Renovation & construction · 9/2/2026
01Asbestos in an older building: legal requirements before renovation
Finding asbestos midway through renovation means stopping work and appointing a certified contractor. A survey is best completed before the project begins.
Renovation & construction · 8/29/2026
02Installing a lift in an older building: legal and practical constraints
The legal right to request a lift and the physical space for a shaft in a historic stairwell are separate questions. The second often determines the outcome.
Renovation & construction · 8/26/2026
03Next Generation refurbishment grants: who can qualify?
Regional application rounds have limited budgets and often require the property to be the owner's main home rather than a rental investment.
Renovation & construction · 8/23/2026
04Changing utility account holders: when a boletín eléctrico is needed
For electrical installations over 20 years old, the supplier requires an accredited installer's certificate before transferring the contract to the new owner.
Renovation & construction · 8/20/2026
05A plot's edificabilidad under the PGM: checks before buying
Land classification and the permitted floor-area ratio set the project's return ceiling before the first architectural sketch. They can be checked through PIC within hours.
Renovation & construction · 8/17/2026
06First-occupation permission and the cédula: what is the difference?
Municipal first occupation and the Generalitat cédula serve different purposes. Check the documents, competent authority and validity before buying.
Renovation & construction · 8/14/2026
07Scaffolding and skips on the street: separate Ajuntament permission
Occupying public space during renovation requires approval separate from the works licence. Include this process in the project programme.
Renovation & construction · 8/11/2026
08Seguro decenal for refurbishment: when is it mandatory?
Structural work does not automatically make insurance compulsory. Check the LOE scope, statutory exceptions and project documents before budgeting.
Renovation & construction · 8/8/2026
09Barcelona's 30% protected-housing quota upheld by the Supreme Court
Reserving a third of floor area for VPO has been recognised as a planning burden rather than expropriation. It is now an established parameter rather than a challengeable risk.
Renovation & construction · 8/5/2026
10Hidden defects: what a pre-purchase technical report checks
A technical survey and legal due diligence are parallel procedures, not substitutes. We explain the inspection's scope and why it should precede arras.
Renovation & construction · 7/26/2026
11Business activity licences: changing the use of commercial premises
Permission for premises to have commercial use and permission for a specific business are separate documents. A tenant change almost always requires the latter again.
Renovation & construction · 5/26/2026
12New construction and major rehabilitation: one licence, different risks
New construction and major rehabilitation follow the same licensing route in Barcelona, but their scope and risk profiles remain very different.
Renovation & construction · 5/23/2026
13Realistic approval times for licences in Barcelona
Verifiable average processing times in days are not available for every Barcelona licence type. There is, however, a clear order of routes by speed and factors that affect them.
Renovation & construction · 5/14/2026
14Converting a building into a hotel: which licensing route applies?
Changing a building to hotel use is not simply permission to renovate. It is a separate procedure with its own sequence of checks. Here is the correct order.
Renovation & construction · 4/26/2026
15How to review a renovation progress report as an investor
Useful reporting connects works, budget, schedule and pending decisions, with photographs alongside. Here is what each section should contain and what to agree with the contractor before work starts.
Renovation & construction · 4/8/2026
16Renovation budget control on a flip: plan, actuals and change orders
Renovation is the one large flip cost that takes shape after purchase. Here's how to build the estimate before you buy, track actuals by certificate, and why no change gets carried out without written approval, with real numbers from the Compte de Urgel project.
Renovation & construction · 1/5/2026
17Llicència d'obres majors: when you need one, and when not
In Barcelona, a full licence (llicència) is only needed for obres majors, the largest-scale works. Lighter works go through notification, comunicat or assabentat, not a "menors licence", which does not exist.
Renovation & construction · 1/2/2026
18Comunicat and assabentat: three tiers without a licence
Light works in Barcelona don't need a full licence: there are three faster tracks, comunicat diferit, comunicat immediat and règim d'assabentat, each with its own pace and conditions.
Renovation & construction · 12/29/2025
19Cédula de habitabilidad: you cannot let without it
The cédula confirms that a home is fit to live in. Without a valid one, letting a property in Catalonia is formally impossible; selling it is possible with conditions, and getting a new cédula takes time.
Renovation & construction · 12/26/2025
20Energy certificate: when you need one and how long it lasts
The certificado de eficiencia energética has to be in hand before a property is advertised for sale or rent, not sorted out at the last minute.
Renovation & construction · 12/23/2025
21ITE: what to check when buying a flat in a building over 45 years old
In Barcelona, buildings more than 45 years old must undergo a technical inspection every 10 years. An overdue ITE is a common finding in historic neighbourhoods and a reason to examine the building more closely.
Renovation & construction · 12/20/2025
22Converting a commercial unit into a home in Barcelona: rules, density and cédula
A commercial unit becomes a home in Barcelona only if the plot allows it, the building can take one more dwelling and the unit meets the area, façade and height rules. Requirements, permits and taxes, with official sources.
Renovation & construction · 12/17/2025
23Renovation and comunidad de propietarios: when neighbours must agree
A municipal licence is not the only approval you need. If the works affect the façade or the common parts of the building, the owners' association has to approve them.
Renovation & construction · 12/14/2025
24Heritage-protected buildings in central Barcelona: limits and value
Heritage status makes renovation harder, but it also creates a structural shortage of supply that underpins the prices of historic property.
All journal pages (4)
Before your first investment decision
12 questions before buying an investment property.
A PDF and one-page worksheet covering entry price, total budget, documents, permits, risks and exit. Receive it in three short steps.
Investor resources