Renovation & construction · 10/13/2026
01An investor dashboard for a development project
The dashboard should show what changes decisions: cost to complete, timetable, permits, sales, cash, risks and quality, each tied to an owner and action.
Renovation & construction · 10/13/2026
02Site geotechnics and foundation risk
A geotechnical investigation describes soil, groundwater and foundation parameters; early evidence helps compare structures and avoid artificially low estimates.
Renovation & construction · 10/13/2026
03Unit mix: how many homes to build and of what type
The unit mix must reflect demand, planning constraints, floor efficiency and the price of each type; the maximum unit count is not always the best outcome.
Renovation & construction · 10/13/2026
04Development finance and loan drawdowns
Bank funding usually follows certified progress and conditions; model equity, interest, fees, works certificates and drawdown delays.
Renovation & construction · 10/13/2026
05Sobre plano pre-sales: how they work for the investor
Off-plan selling runs on a private contract with instalments and cover for their return. A breakdown of the mechanics, the timings and what pre-sales change for a project's investor.
Renovation & construction · 10/13/2026
06Flipping timeline: how long it takes from purchase to sale
A flipping timeline is made of five segments, and only two of them are predictable. Portal data shows the spread of time on the market; the rest depends on the property and on procedures.
Renovation & construction · 10/13/2026
07What it costs to build a house in Barcelona
There is no public price per m² for building a house in Barcelona. The COAC Mòdul Bàsic for 2026 is 677 €, but that is a base for reference budgets, not a price per metre. Here is the method for assembling a budget.
Renovation & construction · 10/12/2026
08Development cost plan: building the complete project budget
A development budget should cover land, tax, design, permits, construction, utilities, finance, marketing, delivery, management and contingency, with a dated source for every line.
Renovation & construction · 10/9/2026
09How many new villas are built in the Zona Alta: an open-data count
In Sarrià-Sant Gervasi and Les Corts, 62 new single-family houses were started in 2021–2025, about 12 a year. I count from Generalitat statistics and explain what the figure does not say.
Renovation & construction · 10/7/2026
10Barcelona EPC green premium: evidence and limits
Energy performance can be associated with value, but research does not support one universal premium for every home.
Renovation & construction · 10/7/2026
11Renovation premium: sale price versus total CAPEX
The buyer’s premium is not investor profit. CAPEX, time and transaction costs sit between the two.
Renovation & construction · 10/7/2026
12Why EPC affects Barcelona areas differently
The same energy class can be valued differently by building, segment, comfort and buyer budget.
Renovation & construction · 10/6/2026
13Renovating after buying in Barcelona: procedure, fees, deadlines
Any renovation in Barcelona goes through the Ajuntament before work starts. Which procedures exist, how long a reply takes, which taxes and fees apply and how to build it into the purchase plan.
Renovation & construction · 10/4/2026
14Reconstructing a Building for a Hotel: Budget Lines to Expect
Construction work is only part of a hotel's budget: next to it stand the ICIO tax, the requirements of the chosen category, furniture and equipment, launch and a reserve. The lines, in order.
Renovation & construction · 10/2/2026
15Renovating a Building in Phases: Schedule, Payments and Risks
A building is renovated in phases, paid by certificación; the LOE allows a 5% retention instead of a one-year guarantee. A three-month delay on 16.36 M€ of capital costs 5.5% of the works budget.
Renovation & construction · 10/2/2026
16Façade, roof and common elements: pre-acquisition CAPEX
The apartment condition does not reflect future building costs. Façade, roof, lift, risers and structure require separate review, with the owner share calculated from participation quotas and community decisions.
Renovation & construction · 10/2/2026
17Cracks and damp: technical risks in a Barcelona building
A crack or damp patch is a symptom, not a diagnosis. The investor needs the cause, whether it is active, required testing, responsible party and cost range.
Renovation & construction · 10/2/2026
18Energy renovation: the business case in Barcelona
Energy renovation is assessed through required works, operating savings, comfort, permits and exit impact. Energy savings should not automatically be translated into an equal increase in value.
Renovation & construction · 10/2/2026
19Building accessibility and upgrade budget in Barcelona
Accessibility is reviewed from street to unit: entrance, steps, lift, clear widths and common areas. Legal obligation, technical feasibility and the owner’s cost share are three separate checks.
Renovation & construction · 10/2/2026
20Building-services capacity before changing a property use
A new use may require more electrical capacity, ventilation, water, drainage and fire systems. Capacity should be checked before final layout and budget.
Renovation & construction · 10/2/2026
21How to compare renovation tenders in Barcelona
Tenders become comparable only after aligning scope, quality, exclusions, timing, taxes and warranties. The lowest total often reflects incomplete scope rather than better value.
Renovation & construction · 10/2/2026
22Milestones, payments and retention in a renovation contract
Payments should be tied to verifiable output, not calendar dates alone. Advance, interim certificates, retention, defect correction and close-out documents form one control system.
Renovation & construction · 10/2/2026
23Renovation contingency for unforeseen works in Barcelona
Contingency depends on design stage and known risks, not one universal percentage. Before opening-up and surveys the range should be wider, then reallocated as the design becomes defined.
Renovation & construction · 10/2/2026
24Critical path for an investment-property renovation
The critical path is the chain of tasks where any delay moves the completion date. In Barcelona it often includes design, permits, community decisions, long-lead procurement and mandatory inspections.
All journal pages (4)
Before your first investment decision
12 questions before buying an investment property.
A PDF and one-page worksheet covering entry price, total budget, documents, permits, risks and exit. Receive it in three short steps.